1. Home
  2. Walk-in showers and shower remodels in Austin

Walk-in showers and shower remodels in Austin

We take out old tubs and build walk-in showers in their place, and we rebuild worn tile showers. We also build curbless entries, benches, and niches, and add support inside the walls for grab bars.

Curbless walk-in shower with a linear drain, a tiled bench, and a long niche

Shower work we take on

We build walk-in showers in Austin houses, including showers where an old tub was and tile showers rebuilt from the studs. We work in hall baths and primary baths. We build curbless showers and showers with a bench, a niche, or a second shower head.

A tiled walk-in shower is built in layers. The floor slopes to the drain, and a waterproofing layer goes behind and under the tile. The tile comes next, followed by the glass. A prefab base with wall panels takes less labor, though it gives you fewer choices for the shower’s size and layout.

Converting a tub to a walk-in shower

We take out the tub and the tile around it, opening the walls down to the studs. Then we move the drain to the shower drain location and upsize it for a shower. We also move the valve and shower head up to shower height.

We build the new floor with a sloped mortar bed or a foam base, waterproof it, and finish it with a low curb or a curbless entry. We frame a niche between the studs and add wood blocking, which is extra framing inside the wall that gives grab bars or a bench something solid to fasten to. If the old tub wall has a window, it needs a plan once it’s inside the shower. We replace it with a window that handles water or raise it.

Curbless and accessible showers

A curbless shower has a shower floor level with the bathroom floor, so the floor under the shower has to drop to make room for the slope to the drain. On a wood-framed floor, we lower the subfloor between the joists and add framing where it’s needed. A linear drain along one wall lets the whole shower floor slope in one direction.

For anyone with limited mobility, a wider entry makes it easier to get into the shower. A built-in bench or fold-down seat provides a place to sit, while a handheld shower on a slide bar can be adjusted to suit the person using it. Lever handles are easier to use, and we add supports called blocking inside the walls for grab bars. A curbless walk-in shower is easier to keep using as you get older.

How a shower remodel runs

We pick the tile, fixtures, and glass style with you first, and we order the tile before demolition. After demolition, we move the plumbing. On permitted work, the city inspector checks the new pipes before the walls are closed. That’s the rough plumbing inspection.

We build and waterproof the shower floor, then flood-test it before setting tile. Once the tile is set and grouted, we trim out the fixtures. We measure for glass after the tile is set because the finished opening depends on the tile. The glass is then made and installed, and a shower curtain covers the days between the tile and the glass.

Permits and cost

The City of Austin says a tub-to-shower conversion can use the city’s express permit when only the tub or shower surround drywall comes out and no fixture moves. We file the permit, and you can read about it in Austin remodel permits.

Angi’s Austin walk-in shower cost page, updated July 15, 2026, publishes a range of $5,886 to $11,772 for walk-in shower installation in Austin. For tub-to-shower ranges and more, see the bathroom remodel cost guide.

FAQ

Questions homeowners ask

How long does a tub-to-shower conversion take?

Fixr’s tub-to-shower conversion article, published January 23, 2025, says a prefab shower the same size as the old tub can take as little as 2 days and custom conversions take 1 to 2 weeks or longer. A tiled shower sits at the longer end because waterproofing, tile, and glass each take their turn. See the remodel timeline guide for more on timing.

Can you build a curbless shower on a slab foundation?

Yes, we cut out and recess the slab where the shower goes so the floor slopes to the drain, then rework the drain line under the slab while it’s open. We check which kind of slab you have at the walkthrough. A post-tensioned slab has steel cables held under tension in the concrete, so we have the cables located and an engineer involved before any cut.

Can you add blocking now for grab bars later?

Yes, we can add blocking while the walls are open for grab bars you may want later. We put wood blocking between the studs at the heights where grab bars or a fold-down seat could go, then photograph it before the walls close so you’ll know where it is later.

When does the shower glass get ordered?

After the tile is set and grouted, we measure the finished tile and order the shower glass made to that size. Pick the glass style and hardware early so the order can go in right after the measurement.